| Project: |
VA4
Data Center, DuPont Fabros (fast track project) |
| Location: |
McLean,
Virginia |
| Client: |
Metromedia
Fiber Network |
| Completed: |
July,
2000 |
| Job
Description: |
Converted
a large, Hechinger’s building into a mission critical,
fault-tolerant data center. |
| Features: |
Installation
of Rotary Power System, UPS, DC Power plant, PDUs, Static
Transfer Switches, 35 Kv switchgear, 480v switchgear,
duct banks, feeders, lighting, power monitoring system,
fire alarm system, EPO system and data/communications
rough-in. |
| Points
of Interest: |
$11M
fast track project completed in 6 months. |
|



|